FIRST THROUGH TRAIN LAVERTON TO CHELTENHAM
SINCE THE LANDSLIPS
30TH OCTOBER 2012
Our faithful crew have prepared 7903 to an immaculate state and are readying to take the first train the complete length of the line since the disastrous landslips. Covering the entire line over the extension to Laverton right through to Cheltenham. Congratulations must go to The Gloucestershire Warwickshire Railway for their fortitude in tackling such as serious situation which could have closed a less dedicated group and to all the good folk who contributed to the fund to rebuild the line. Follow this link for the full story http://www.gwsr.com
The BBC added to the unique atmosphere of the day by fixing a video camera to the front of our locomotive on the first run and some great footage can be viewed here GWR Re-opens with John Cruxon on the regulator and Steve Oddy firing
Now we were all looking forward to an exciting 2013 for both the railway and our locomotive